[Note: To expand text boxes, click the heading or arrow button.
To collapse them, click the heading or arrow button a second time.]
PART 1 – CHAPTERS 1-3
Chapter 1 — Introduction
-
-
- Appendix 1-A — Glossary of Terms and Acronyms
-
Chapter 2 — Applicable Law and Regulations
-
-
- Appendix 2-A — Virginia Stormwater Management Act
- Appendix 2-B — VSMP Permit Regulations
- Appendix 2-C — General Permit Regulation for Discharges of Stormwater from Construction Activities
- Appendix 2-D — General VPDES Permit for Discharges of Stormwater from Small Municipal Separate Storm Sewer Systems
-
Chapter 3 — Qualifying Local SWM Programs
-
- Appendix 3-A — Potential Elements of a Comprehensive Stormwater Management Program
- Appendix 3-B — Developing an Effective Local Stormwater Management Program
- Appendix 3-C — Information Tools for Local Stormwater Management
- Appendix 3-D — Local Code and Ordinance Review and Evaluation
- Appendix 3-E — Case Study: Setting up a Local Stormwater Utility, City of Staunton, Virginia
- Appendix 3-F — Example Site Plan Review Checklists
- Appendix 3-G — SWM and BMP Construction Inspections
+ + + + + + + + + + + + + + + + + + +
PART 2 – CHAPTERS 4-7
Chapter 4 — Why Stormwater Matters
Chapter 5 — Managing Stormwater
-
-
- Appendix 5-A — The Impervious Cover Model: An Emerging Framework for Urban Stormwater Management
- Appendix 5-B — Watershed-Based Stormwater Planning
- Appendix 5-C — Special Stormwater Management Considerations for Redevelopment
- Appendix 5-D — Stormwater Pollution Benchmarking Tool for Existing Industrial, Federal and Municipal Facilities in Virginia
-
Chapter 6 — Site Planning and Design Considerations
-
-
- Sections 6.0-6.5
- Sections 6.6-6-10
- Appendix 6-A — Site Plan Preparation and Submission as Part of the Land Development Process
- Appendix 6-B — Stormwater Design Guidelines for Karst Terrain in Virginia
- Appendix 6-C — Stormwater Design in the Coastal Plain of Virginia
- Appendix 6-D — The Sustainable Sites Initiative
-
Chapter 7 — BMP Upgrades and Retrofits
-
- Appendix 7-A — Retrofit Case Study: Charlottesville, Virginia
- Appendix 7-B — CWP Retrofit Reconnaissance Investigation Checklist
- Appendix 7-C — Derivation of the Retrofit Pollution Removal Adjustor Curves
+ + + + + + + + + + + + + + + + + + +
PART 3 – CHAPTERS 8-13
Chapter 8 — BMP Overview and Selection Criteria
-
-
- Appendix 8-A — Example BMP Design Checklists
-
Chapter 9 — BMP Inspection and Maintenance
-
-
- Appendix 9-A — Results of a Field Survey of BMPs
- Appendix 9-B — Example BMP Maintenance Agreements
- Appendix 9-C — Example BMP Inspection — Maintenance Checklists
- Appendix 9-D — From the Drafting Board to the Field — Designing BMPs to Facilitate and Simplify Maintenance
- Appendix 9-E — Example of a Method to Estimate Sediment Accumulation
-
Chapter 10 — Uniform Stormwater BMP Sizing Criteria
-
-
- Appendix 10-A — Optional Recharge Volume Approach
- Appendix 10-B — Better Protection from Stream Channel Erosion
-
Chapter 11 — Hydrologic Methods and Computations
-
-
- Appendix 11-A — Hydrologic Soil Groups of Virginia Soils
- Appendix 11-B — 24-Hour Rainfall Depth Data for Virginia
- Appendix 11-C — Rainfall-Runoff Tables for Selected Runoff Curve Numbers
- Appendix 11-D — Stormwater Computer Models
- Appendix 11-E — Filter and Drainage Diaphragm Design
-
Chapter 12 — Virginia Runoff Reduction Method Compliance Spreadsheet User’s Guide & Documentation
Chapter 13 — Example Site Plans
+ + + + + + + + + + + + + + + + + + +